THIS IS A 10-DAY WORK-A-THON DONE WITH RDD IN REDMOND, OR, JUST A FEW BLOCKS AWAY FROM COMPOSITE-ASSIST!

BUILD-SESSION 2: WITH RDD IN REDMOND, OR:

First an overview.
Time for the door install and fitting!
Time for the flight control bodywork!
Time for the hydraulic tubes, of which there are a decent many.
Time for the landing gear.
Time for the aileron trim.
Time for the elevator trim.
Time for the flight control installation.
Time for the aft pressure bulkhead.
Time for the landing gear doors.
Time for the tail-mod that makes this thing look like a Lancair!